Close More Jobs.
Chase Fewer Quotes.
Built for stone shops: fast on-site quotes, a CRM that follows up for you, and automated workflows that take jobs from lead to installed — without the spreadsheet chaos.
Also available on
Works inside Claude and ChatGPT
Ask about your jobs, quotes and inventory from the assistant you already use. Sign in with your Stone Project account, nothing to paste. Pro plan.
How it worksWatch Stone Project at Work
From first quote to job installed — see how fabricators use our CRM and automation to win more work with less effort.
Stone Shops Lose Deals Every Week
Because Quotes Slip Through the Cracks
We built Stone Project by listening to fabricators. These are the pains we heard over and over.
"What if your CRM actually closed quotes for you?"
Follow a Countertop From Phone Call to Paid
Every screen below is the real app, running a real shop's day. Scroll and watch one kitchen move through it.
-
Mon 8:12am
A lead comes in
A homeowner calls about a kitchen island. It lands on your dashboard with the quotes waiting, the invoices due and the jobs already in production — so you know what today looks like before you pick up the phone.
-
Mon 11:40am
The quote goes out
Material and labour priced by the square foot off your own price list, payment terms already filled in, PDF ready to send. No spreadsheet, no calling the office to check a number.
-
Wed
Approved — it enters the shop
The job moves from Quoted to Approved and keeps moving: template, layout, production, installation. Anyone on the team can see where every kitchen stands without asking.
-
Thu
Template and install get scheduled
Measure Thursday, install the following Tuesday, delivery in between. The crew sees their week, the client gets the confirmation, and nobody drives to an address twice.
-
Installed
The invoice collects itself
Deposit on approval, balance on installation, card on file. You can see at a glance what is paid, what is partial and what is overdue — and the client pays from a link, no login.
-
Friday
The review asks itself
The job closes and the review request goes out on its own. That is how the next lead finds you — and the whole loop starts again.
Dashboard — what today looks like
Everything a Stone Shop Needs to Close More Jobs
Quoting, CRM, scheduling and automation — all in one place, designed for the way countertop fabricators actually work.
Quotes With Drawings, Sent On the Spot
Measure on-site, sketch the countertop, and send a professional quote with itemized material, edges, cutouts and labor — before you leave the driveway.
- Drawing + edges + cutouts tied to price
- Saved templates & price books per material
- Branded PDFs, sent by email with one tap
- Client opens, approves or rejects online
From Approval to Invoice in Minutes
Approved quotes convert to invoices with one tap. Take deposits, track balances, and record payments — with receipts and status synced back to the project.
- One-tap quote invoice conversion
- Deposits, payment plans & reminders
- Multi-currency (USD, BRL, EUR, MXN + more)
- QuickBooks sync for your bookkeeper
Automate the Boring Stuff
Automated follow-ups, stage transitions, deadline reminders and client updates — so nothing slips through the cracks while you focus on running the shop.
- Auto follow-up on unanswered quotes
- Kanban stages that trigger actions & notifications
- Deadline reminders for measurement, fab & install
- Auto review requests after completed jobs
A CRM That Knows Every Job & Every Client
Every quote, message, invoice and photo linked to the right client and project. Your team sees exactly where each job stands — without asking.
- Visual Kanban: Lead Quote Approved Install Done
- Role-based team permissions (owner, admin, member)
- Client portal with quotes, invoices & messages
- Pipeline & financial analytics dashboard
Stay On Schedule From Measure to Install
One calendar for measurements, fabrication and installs. Drag-and-drop activities, optimized daily routes and automatic reminders keep every job on track — and your team in sync across iOS, Android, Mac, Windows and the web.
- Drag-and-drop activities by team member & vehicle
- Optimized daily routes for installs & deliveries
- Auto reminders 24h & 4h before each appointment
- Syncs across iOS, Android, Mac, Windows & Web
Bring a real job into Stone Project
Start with a client and a quote you already have. See how your shop’s information fits before moving the rest.
Start free trialWhat you can bring
- Clients
- Names and contact details from your CSV export.
- Quotes
- Prices and countertop drawings from your existing system.
- Calendar
- Measurements, fabrication and installations already scheduled.
Stone Project vs. Spreadsheets vs. Generic CRM
Built for stone shops — not retrofitted from a generic sales tool.
| Feature | Stone Project | Spreadsheets | Generic CRM |
|---|---|---|---|
| Quote drawings with edges & cutouts | — | — | |
| Remnant marketplace & inquiries | — | — | |
| Price book per material / edge / cutout | Manual | Generic | |
| QuickBooks 2-way sync | — | Limited | |
| Route optimization for installs | — | — | |
| AR/LiDAR countertop measurement | — | — | |
| Offline mode at job sites | If local | — | |
| Client portal (quote approval & payments) | — | Add-on | |
| Team roles & permissions for shop floor | — | Generic | |
| Built by and for stone fabricators | — | — |
Pricing Built for Stone Shops of Every Size
Every plan includes the full CRM, quoting, automation, scheduling and marketplace. Pick a plan by team size and storage.
Business
5 users · 50 GB storage
Every plan includes:
* The promotional price is valid for the first 12 months. After that period, the regular price will be charged. Free trial available on every plan — no credit card required.
Connects with what you already use
Every service connects through your own account, authorized by you in Settings and disconnected whenever you want. Your data and your money stay yours.
Accounting & payments
QuickBooks Online Pro
QuickBooks Payments
Stripe
Square
PayPal
HelcimFluidPay
FinixPlaid bank feeds · Pro
Xero
QuickBooks Desktop Web Connector
Mercado Pago Latin America
Clover US & Canada
Yappy Panama
Accounting export & payroll
Sage 100, Sage 300, Sage Intacct export file
NetSuite export fileTrimble Spectrum & Vista export file
Foundation export fileComputerEase export file
Acumatica export file
Gusto time cards
ADP time cards
Paychex time cards
Paylocity time cards
CRM & marketing
HighLevel
Meta (Facebook & Instagram)
WhatsApp
Google Business Profile reviews
Email & calendar
Microsoft 365 / Outlook
Gmail / Google Workspace
Google Calendar
Apple Calendar iCal feed
Any IMAP/SMTP mailbox
Job site & photos
CompanyCamGoogle Maps Platform
Horus / Iris slab scannerSlabSmith slab inventory sync
SlabVision Park slab inventory sync
LT3Raptor LPI laser templates into jobsGoogle Drive attach files
Dropbox attach files
Box attach files
OneDrive attach files
Microsoft Project import & export
AI assistants
Sign-in
Google
Apple
Remnant Finder marketplace
Shopify
WooCommerce
Wix
ShippoStripe Connect supplier payouts
Data & developers
CSV import
Phone contacts
Webhooks
REST API
Zapier
Your Shop in Your Pocket. Your Office. Your Truck.
Start a quote on the job site from your phone, finish it on your Mac, approve it from the truck. Everything syncs — instantly.
One subscription. Every device. Real-time sync across your team.
See all download optionsThe Complete Platform Map
60+ tools across 10 categories. Click any tab to explore what's actually inside the app.
AR Measurement
Measure countertops with your iPhone or Android using ARKit/ARCore. No tape, no clipboard. Walk the kitchen, tap corners, get exact dimensions.
AI Drawing Assistant
Snap a sketch on a napkin or photo from a measure. Our AI converts it into a clean, quote-ready countertop drawing in seconds.
Magic Layout (Slab Nesting)
AI nests pieces onto slabs using a max-rects algorithm and seam planner. Save 10–15% material on every job — automatically.
Photo Catalog Entry
Take a picture of a remnant. ML Kit + edge detection auto-fills shape, dimensions, and dominant color. Inventory in seconds.
Piece Similarity Search
Customer wants "something like that quartz from last week"? AI finds visually-similar remnants in your yard instantly.
Smart Price Estimate
ML model suggests pricing for new quotes based on your historical jobs, material, edge type, and complexity.
Try the Quote Widget — Right Here
This is the same interactive quote builder you can embed on your website. Drag shapes, pick materials, place cutouts — and your leads land directly in your CRM.
Embed this on your own site with two lines of HTML:
<div id="rf-quote-widget" data-company-id="YOUR_COMPANY_ID"></div>
<script src="https://api.stoneproject.app/widget/quote.js" async></script>
How Much Is Your Current Workflow Costing You?
Enter your numbers. See what stone shops like yours save every month with Stone Project.
From closing +15% more quotes with faster, branded PDFs and automatic follow-ups.
Across your whole team — no more retyping, chasing quotes, or double-entering into QuickBooks.
Frequently Asked Questions
Everything you need to know before getting started.
Do I need a credit card to start?
How long does it take to set up?
Will it work with QuickBooks?
Can my team use it too?
Does it work offline at job sites?
Is my data safe? Can I export it?
Can I cancel anytime?
Learn from the Shop Floor
Guides, case studies and tactics written for stone fabricators.
Send your next quote from the driveway.
Create quotes, manage jobs, and sell stone remnants with Stone Project.

